安装4 m的下水道,在泰晤士河畔金斯敦绿化工作,萨里
-
位置泰晤士河畔金斯敦
-
贸易景观
-
发布
-
聘请了
工作描述
- 躺通路
客户的描述
。剪切、拆除和挖出4 m跟踪通道排水管安装。(include waste removal) • Cut out and demolish existing surface drain hopper and excavate around and install pipework for new channel drain connection. • Lay 4m channel drain on 2 opposing gradients to discharge mid-channel . connect down pipe to gully with correct fitting on side
10月24日,2022:- - - - - - - - - - - - - - - - - - - - - - - - -通道排水管,骨料,排水配件、焦油Mac
10月24日,2022:- - - - - - - - - - - - - - - - - - - - - - - - -请报价有兴趣(工党+材料+废物移除)